PR 17 (PI¥ERO over JOSEFINA CREEK
0.6 KM WEST OF PR 18 · County 127, Puerto Rico · Built 1950 · 7 Lanes · 42,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.406978, -66.075136
This bridge is in worse condition than 25.9% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 76 years old.
Nearby Bridges
ANDALCIA ST 0.1 KM over JOSEFINA CREEK KM 0.1
Built 1950
PR 18 2.6 KM over PR 17 4.0 KM
Built 1967
PR 17 WBD 4.3 KM over PIEDRAS RIVER
Built 1950
PR 17 4.0 KM over PIEDRAS RIVER
Built 1967
AMRCO MIRDA 2.2 KM over JOSEFINA CREEK
Built 1950
PR 18 2.1 KM over PIEDRAS RIVER
Built 1967
RP PR18 PR17 .1 KM over PIEDRAS RIVER
Built 1967
PR18 PR17 10.1 KM over PIEDRAS RIVER
Built 1967
AMRCO MRNDA 1.6 KM over DOÑA ANA CREEK
Built 1950
29 ST S.E 0.1 KM over DO¥A ANA CREEK
Built 1955
Bridge Details
- Structure #
- 012021
- Year Built
- 1950
- Length
- 18.7 m (61.4 ft)
- Max Span
- 9.3 m
- Width
- 33.8 m (110.9 ft)
- Lanes
- 7
- Daily Traffic
- 42,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,233,000
- Total Project Cost
- $1,479,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.