29 ST S.E 0.1 KM over DO¥A ANA CREEK
0.05KM OF A. MIRANDA AVE. · County 127, Puerto Rico · Built 1955 · 2 Lanes · 8,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.400644, -66.078622
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 71 years old.
Nearby Bridges
AMRCO MRNDA 1.6 KM over DOÑA ANA CREEK
Built 1950
31 S.E. STREET over JOSEFINA CREEK
Built 1964
AMRCO MIRDA 2.2 KM over JOSEFINA CREEK
Built 1950
21 ST 0.1 KM over DOÑA ANA CREEK
Built 1960
21 STREET 0.01 KM over JOSEFINA CREEK
Built 1940
ANDALCIA ST 0.1 KM over JOSEFINA CREEK KM 0.1
Built 1950
9 S.E. STREET over JOSEFINA CREEK
Built 1950
PR 17 (PI¥ERO over JOSEFINA CREEK
Built 1950
PR 18 3.35 KM over AVE. AMER MIRANDA 1.4 KM
Built 1967
DE DIEGO AVENUE over DO%A ANA CREEK
Built 1955
Bridge Details
- Structure #
- 021431
- Year Built
- 1955
- Length
- 9.2 m (30.2 ft)
- Max Span
- 3 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $22,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.