21 STREET 0.01 KM over JOSEFINA CREEK
INT. 54 AND 52 SE STREETS · County 127, Puerto Rico · Built 1940 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.397167, -66.078056
This bridge is in worse condition than 25.9% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 86 years old.
Nearby Bridges
31 S.E. STREET over JOSEFINA CREEK
Built 1964
9 S.E. STREET over JOSEFINA CREEK
Built 1950
29 ST S.E 0.1 KM over DO¥A ANA CREEK
Built 1955
21 ST 0.1 KM over DOÑA ANA CREEK
Built 1960
AMRCO MRNDA 1.6 KM over DOÑA ANA CREEK
Built 1950
AMRCO MIRDA 2.2 KM over JOSEFINA CREEK
Built 1950
DE DIEGO AVENUE over DO%A ANA CREEK
Built 1955
PR 18 3.35 KM over AVE. AMER MIRANDA 1.4 KM
Built 1967
PR 21 over JOSEFINA CREEK
Built 1965
ANDALCIA ST 0.1 KM over JOSEFINA CREEK KM 0.1
Built 1950
Bridge Details
- Structure #
- 021391
- Year Built
- 1940
- Length
- 9.4 m (30.8 ft)
- Max Span
- 2.7 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $23,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.