PR 18 2.6 KM over PR 17 4.0 KM
AT INT PR 18 AND PR 17 · County 127, Puerto Rico · Built 1967 · 10 Lanes · 183,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.40725, -66.069914
This bridge is in worse condition than 89.6% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 59 years old.
Nearby Bridges
PR 17 4.0 KM over PIEDRAS RIVER
Built 1967
PR 17 WBD 4.3 KM over PIEDRAS RIVER
Built 1950
PR18 PR17 10.1 KM over PIEDRAS RIVER
Built 1967
RP PR18 PR17 .1 KM over PIEDRAS RIVER
Built 1967
PR 18 2.1 KM over PIEDRAS RIVER
Built 1967
PR 17 (PI¥ERO over JOSEFINA CREEK
Built 1950
PR 18 over DOMENECH STREET
Built 1967
ANDALCIA ST 0.1 KM over JOSEFINA CREEK KM 0.1
Built 1950
PR 41 over DE LOS MUERTOS CREEK
Built 1929
GALILEO STREET over BUENA VISTA CREEK
Built 1950
Bridge Details
- Structure #
- 010081
- Year Built
- 1967
- Reconstructed
- 1982
- Length
- 66.6 m (218.5 ft)
- Max Span
- 20.1 m
- Width
- 45.2 m (148.3 ft)
- Lanes
- 10
- Daily Traffic
- 183,800
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $828,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.