PR 41 over DE LOS MUERTOS CREEK
NORTH OF PI¥ERO AVEN · County 127, Puerto Rico · Built 1929 · 2 Lanes · 11,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.409897, -66.064736
This bridge is in worse condition than 25.9% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 97 years old.
Nearby Bridges
PR18 PR17 10.1 KM over PIEDRAS RIVER
Built 1967
RP PR18 PR17 .1 KM over PIEDRAS RIVER
Built 1967
PR 17 WBD 4.3 KM over PIEDRAS RIVER
Built 1950
PR 17 4.0 KM over PIEDRAS RIVER
Built 1967
PR 18 2.1 KM over PIEDRAS RIVER
Built 1967
PR 18 2.6 KM over PR 17 4.0 KM
Built 1967
PR 18 over DOMENECH STREET
Built 1967
NTRE DME ST 0.1 KM over PIEDRAS RIVER
Built 1965
GALILEO STREET over BUENA VISTA CREEK
Built 1950
PR 1 (MU¥OZ R over PR 17 (PI¥ERO AVENU
Built 1993
Bridge Details
- Structure #
- 001971
- Year Built
- 1929
- Reconstructed
- 1997
- Length
- 8.3 m (27.2 ft)
- Max Span
- 7.1 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 11,500
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $66,000
- Total Project Cost
- $178,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.