PR 165 over PR 5
IN THE TOWN OF CATA¥ · County 033, Puerto Rico · Built 1972 · 4 Lanes · 46,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
18.439028, -66.125147
This bridge is in worse condition than 37.5% of bridges in County 033. The average bridge in Puerto Rico is 0 years old; this one is 54 years old.
Nearby Bridges
PR 888 1.0 KM over MALARIA CHANNEL
Built 1943
PR 165 over LA MALARIA CHANNEL
Built 1972
PR 5 over BUCHANNAN CHANNEL
Built 1943
PR 22 over MALARIA CREEK
Built 1971
PR 22 over OIL PIPE LINES
Built 1971
PR 22 over DRAINAGE DITCH
Built 1971
PR 22 over DRAINAGE DITCH
Built 1971
PR 22 over PR 28
Built 1971
PR 165 36.7 KM over PR 24 0.1 KM
Built 1972
PERIMETER RD. over EL TORO CREEK
Built 1947
Bridge Details
- Structure #
- 011361
- Year Built
- 1972
- Length
- 345.6 m (1133.9 ft)
- Max Span
- 25.1 m
- Width
- 33.1 m (108.6 ft)
- Lanes
- 4
- Daily Traffic
- 46,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $989,000
- Total Project Cost
- $1,187,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.