PR 165 over LA MALARIA CHANNEL

2 KM WEST OF CATA¥O · County 033, Puerto Rico · Built 1972 · 4 Lanes · 33,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
011691
Year Built
1972
Length
147.3 m (483.3 ft)
Max Span
56.5 m
Width
36.1 m (118.4 ft)
Lanes
4
Daily Traffic
33,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.