4TH AVE over SANTIAM-ALBANY CANAL
4TH AVE AND VINE ST · County 043, Oregon · Built 1930 · 2 Lanes · 515 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.634189, -123.112011
This bridge is in worse condition than 20.6% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 96 years old.
Nearby Bridges
5TH AVE over SANTIAM-ALBANY CANAL
Built 2003
3RD AVE over CALAPOOIA RV
Built 1960
6TH AVE over SANTIAM-ALBANY CANAL
Built 2000
7TH AVE over SANTIAM-ALBANY CANAL
Built 1930
9TH AVE over SANTIAM-ALBANY CANAL
Built 1930
10TH AVE over SANTIAM-ALBANY CANAL
Built 1930
11TH AVE over SANTIAM-ALBANY CANAL
Built 1930
US 20 (HWY 31) EB over Willamette River
Built 1925
12TH AVE over SANTIAM-ALBANY CANAL
Built 1997
US 20 (HWY 31) WB over Willamette River
Built 1971
Bridge Details
- Structure #
- 43C15 000
- Year Built
- 1930
- Reconstructed
- 2000
- Length
- 6.8 m (22.3 ft)
- Max Span
- 6.4 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 2
- Daily Traffic
- 515
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.