US 20 (HWY 31) EB over Willamette River

IN ALBANY · County 003, Oregon · Built 1925 · 2 Lanes · 16,759 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01025D031 01044
Year Built
1925
Reconstructed
1971
Length
332.2 m (1089.9 ft)
Max Span
61 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
16,759
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,490,000
Total Project Cost
$5,584,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.