5TH AVE over SANTIAM-ALBANY CANAL

0.3 MI W ELLSWORTH · County 043, Oregon · Built 2003 · 2 Lanes · 2,060 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
19859 000 00000
Year Built
2003
Length
8 m (26.2 ft)
Max Span
7.9 m
Width
20.3 m (66.6 ft)
Lanes
2
Daily Traffic
2,060
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.