7TH AVE over SANTIAM-ALBANY CANAL
7TH AVE AND VINE ST · County 043, Oregon · Built 1930 · 2 Lanes · 1,648 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.631875, -123.111472
This bridge is in worse condition than 20.6% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 96 years old.
Nearby Bridges
6TH AVE over SANTIAM-ALBANY CANAL
Built 2000
5TH AVE over SANTIAM-ALBANY CANAL
Built 2003
9TH AVE over SANTIAM-ALBANY CANAL
Built 1930
4TH AVE over SANTIAM-ALBANY CANAL
Built 1930
10TH AVE over SANTIAM-ALBANY CANAL
Built 1930
11TH AVE over SANTIAM-ALBANY CANAL
Built 1930
3RD AVE over CALAPOOIA RV
Built 1960
12TH AVE over SANTIAM-ALBANY CANAL
Built 1997
OR 99E (HWY 58) over HWY 31 (US 20)
Built 1940
US 20 (HWY 31) WB over Willamette River
Built 1971
Bridge Details
- Structure #
- 43C13 000
- Year Built
- 1930
- Length
- 7 m (23 ft)
- Max Span
- 6.7 m
- Width
- 19.8 m (65 ft)
- Lanes
- 2
- Daily Traffic
- 1,648
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.