3RD AVE over CALAPOOIA RV
AT BRYANT PARK · County 043, Oregon · Built 1960 · 2 Lanes · 1,236 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
44.635161, -123.1125
This bridge is in worse condition than 83.3% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 66 years old.
Nearby Bridges
4TH AVE over SANTIAM-ALBANY CANAL
Built 1930
5TH AVE over SANTIAM-ALBANY CANAL
Built 2003
6TH AVE over SANTIAM-ALBANY CANAL
Built 2000
7TH AVE over SANTIAM-ALBANY CANAL
Built 1930
9TH AVE over SANTIAM-ALBANY CANAL
Built 1930
10TH AVE over SANTIAM-ALBANY CANAL
Built 1930
US 20 (HWY 31) EB over Willamette River
Built 1925
US 20 (HWY 31) WB over Willamette River
Built 1971
11TH AVE over SANTIAM-ALBANY CANAL
Built 1930
12TH AVE over SANTIAM-ALBANY CANAL
Built 1997
Bridge Details
- Structure #
- 43C09 000 00000
- Year Built
- 1960
- Length
- 67.4 m (221.1 ft)
- Max Span
- 19.8 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,236
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $786,000
- Total Project Cost
- $1,257,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.