US 20 (HWY 31) WB over Willamette River

IN ALBANY · County 003, Oregon · Built 1971 · 2 Lanes · 13,386 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
09806 031 01045
Year Built
1971
Length
349.3 m (1146 ft)
Max Span
70.1 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
13,386
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,670,000
Total Project Cost
$5,871,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.