11TH AVE over SANTIAM-ALBANY CANAL

11TH AVE AND VINE ST · County 043, Oregon · Built 1930 · 2 Lanes · 1,082 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
43C16 000
Year Built
1930
Length
7.6 m (24.9 ft)
Max Span
7.3 m
Width
20.5 m (67.3 ft)
Lanes
2
Daily Traffic
1,082
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.