NM-126 over RIO DE LAS VACAS
12.2 Mi. E. Jct. US 550 · County 043, New Mexico · Built 2004 · 2 Lanes · 53 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.996611, -106.806336
This bridge is in worse condition than 48.3% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 22 years old.
Nearby Bridges
FDR 94 over RIO LAS VACAS
Built 1960
NM-126 over Rito LasPalomas
Built 2022
NM-126 over CLEAR CREEK
Built 2003
FDR 70 over AMERICAN CREEK
Built 1988
NM-126 over RITO PENA NEGRAS
Built 1935
FDR 20 over RIO LAS VACAS
Built 1986
43-OS13 over Rio Puerco
Built 2011
NM-126 over RITO LECHE
Built 1969
49-Z006 over SANTA CRUZ RIVER
Built 1980
43-0011 over Arroyo Hondo
Built 1937
Bridge Details
- Structure #
- 000000000009327
- Year Built
- 2004
- Length
- 21.9 m (71.9 ft)
- Max Span
- 21.6 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 53
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.