49-Z006 over SANTA CRUZ RIVER
0.7 M S OF NM 76 & CR 94 · County 049, New Mexico · Built 1980 · 2 Lanes · 328 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.011269, -106.951433
This bridge is in worse condition than 83.1% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 46 years old.
Nearby Bridges
NM-126 over RITO LECHE
Built 1969
US-550 over RITO LECHE
Built 1970
43-0011 over NACIMIENTO CREEK
Built 1932
US-550 over RIO PUERCO
Built 1970
US-550 over NACIMIENTO CREEK
Built 1965
43-Z009 over RITO LECHE
Built 2021
NM-197 over RIO LECHE CREEK
Built 1962
NM-197 over RIO PUERCO
Built 1962
NM-197 over UNNAMED WATERWAY
Built 1962
39-057 over RIO GRANDE
Built 1986
Bridge Details
- Structure #
- 000000000008387
- Year Built
- 1980
- Length
- 16 m (52.5 ft)
- Max Span
- 14.9 m
- Width
- 6 m (19.7 ft)
- Lanes
- 2
- Daily Traffic
- 328
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $40,000
- Total Project Cost
- $61,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.