NM-126 over RITO LECHE
0.9 MI SE JCT US 550/CUBA · County 043, New Mexico · Built 1969 · 2 Lanes · 693 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
36.015953, -106.948922
This bridge is in worse condition than 85% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 57 years old.
Nearby Bridges
49-Z006 over SANTA CRUZ RIVER
Built 1980
US-550 over RITO LECHE
Built 1970
US-550 over RIO PUERCO
Built 1970
43-Z009 over RITO LECHE
Built 2021
43-0011 over NACIMIENTO CREEK
Built 1932
US-550 over NACIMIENTO CREEK
Built 1965
NM-197 over RIO LECHE CREEK
Built 1962
NM-197 over RIO PUERCO
Built 1962
NM-197 over UNNAMED WATERWAY
Built 1962
39-057 over RIO GRANDE
Built 1986
Bridge Details
- Structure #
- 000000000005074
- Year Built
- 1969
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.1 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 693
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $39,000
- Total Project Cost
- $58,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.