43-Z009 over RITO LECHE

0.1 MI N NM-197 IN CUBA · County 043, New Mexico · Built 2021 · 2 Lanes · 81 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000000009992
Year Built
2021
Length
14.3 m (46.9 ft)
Max Span
4.9 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
81
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$165,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.