NM-126 over Rito LasPalomas
13.05 E of US-550 · County 043, New Mexico · Built 2022 · 2 Lanes · 54 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
35.9925, -106.794167
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 4 years old.
Nearby Bridges
FDR 94 over RIO LAS VACAS
Built 1960
NM-126 over RIO DE LAS VACAS
Built 2004
NM-126 over CLEAR CREEK
Built 2003
NM-126 over RITO PENA NEGRAS
Built 1935
FDR 70 over AMERICAN CREEK
Built 1988
FDR 20 over RIO LAS VACAS
Built 1986
43-OS13 over Rio Puerco
Built 2011
NM-126 over RIO CEBOLLA
Built 1935
FDR 378 over RIO CEBOLLA
Built 1967
FDR 103 over RIO PUERCO
Built 1976
Bridge Details
- Structure #
- 000000000009582
- Year Built
- 2022
- Length
- 16.8 m (55.1 ft)
- Max Span
- 16.8 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 54
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.