FDR 103 over RIO PUERCO
AT RIO PUERCO CG · County 039, New Mexico · Built 1976 · 1 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
36.099989, -106.725475
This bridge is in worse condition than 94.3% of bridges in County 039. The average bridge in New Mexico is 0 years old; this one is 50 years old.
Nearby Bridges
NM-96 over POLEO CREEK
Built 1952
NM-96 over AGUA SARCA
Built 1954
NM-96 over Rio Puerco
Built 2022
NM-96 over RITO DEL OSO
Built 1954
39-212 over COYOTE CREEK
Built 1935
FDR 70 over AMERICAN CREEK
Built 1988
NM-126 over Rito LasPalomas
Built 2022
FDR 94 over RIO LAS VACAS
Built 1960
NM-126 over RIO DE LAS VACAS
Built 2004
NM-126 over CLEAR CREEK
Built 2003
Bridge Details
- Structure #
- 031001000001102
- Year Built
- 1976
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $130,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.