43-OS13 over Rio Puerco
2.7 NE of NM 126 · County 043, New Mexico · Built 2011 · 2 Lanes · 102 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
36.041978, -106.916969
This bridge is in worse condition than 85% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 15 years old.
Nearby Bridges
NM-126 over RITO LECHE
Built 1969
US-550 over RIO PUERCO
Built 1970
US-550 NBL/SBL over RITO DE LOS PINOS WETLAN
Built 2000
49-Z006 over SANTA CRUZ RIVER
Built 1980
39-057 over RIO GRANDE
Built 1986
US-550 over RITO LECHE
Built 1970
43-Z009 over RITO LECHE
Built 2021
43-0011 over NACIMIENTO CREEK
Built 1932
US-550 over SAN JOSE CREEK
Built 1989
US-550 over NACIMIENTO CREEK
Built 1965
Bridge Details
- Structure #
- 000000000009496
- Year Built
- 2011
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.5 m
- Width
- 5 m (16.4 ft)
- Lanes
- 2
- Daily Traffic
- 102
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $250,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.