43-0011 over Arroyo Hondo
3.5 M S JCT US-550/NM-197 · County 043, New Mexico · Built 1937 · 2 Lanes · 112 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.963647, -106.951417
This bridge is in worse condition than 85% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 89 years old.
Nearby Bridges
US-550 over SAN PABLO CANYON
Built 1964
43-0011 over SAN MIGUEL CANYON
Built 2023
49-Z006 over SANTA CRUZ RIVER
Built 1980
43-0011 over NACIMIENTO CREEK
Built 1932
US-550 over NACIMIENTO CREEK
Built 1965
NM-197 over RIO LECHE CREEK
Built 1962
43-Z009 over RITO LECHE
Built 2021
NM-126 over RITO LECHE
Built 1969
NM-197 over RIO PUERCO
Built 1962
NM-197 over UNNAMED WATERWAY
Built 1962
Bridge Details
- Structure #
- 000000000001787
- Year Built
- 1937
- Length
- 23.2 m (76.1 ft)
- Max Span
- 7.6 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 112
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $74,000
- Total Project Cost
- $111,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.