43-0011 over SAN MIGUEL CANYON
6.5 M S JCT US-550/NM-197 · County 043, New Mexico · Built 2023 · 2 Lanes · 105 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.922336, -106.941358
This bridge is in worse condition than 48.3% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 3 years old.
Nearby Bridges
US-550 over SAN PABLO CANYON
Built 1964
43-0011 over Arroyo Hondo
Built 1937
US-550 over RIO PUERCO
Built 2001
US-550 over RIO PUERCO
Built 2001
US-550 over ARROYO DE LOS PINOS
Built 1966
49-Z006 over SANTA CRUZ RIVER
Built 1980
43-0011 over NACIMIENTO CREEK
Built 1932
US-550 over NACIMIENTO CREEK
Built 1965
NM-197 over RIO LECHE CREEK
Built 1962
43-Z009 over RITO LECHE
Built 2021
Bridge Details
- Structure #
- 000000000010149
- Year Built
- 2023
- Length
- 9.6 m (31.5 ft)
- Max Span
- 2.6 m
- Lanes
- 2
- Daily Traffic
- 105
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $170,000
- Total Project Cost
- $255,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.