I-89 NH 10 SB over HEATER ROAD

0.6 MI FROM HARDY HILL RD · County 009, New Hampshire · Built 1966 · 2 Lanes · 16,677 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
014401400012400
Year Built
1966
Length
56.7 m (186 ft)
Max Span
25.3 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
16,677
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.