I-89 NH 10 NB over HARDY HILL ROAD

2.5 MI FROM ENFIELD T.L. · County 009, New Hampshire · Built 1966 · 2 Lanes · 16,261 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
014401560011700
Year Built
1966
Reconstructed
2017
Length
14.5 m (47.6 ft)
Max Span
12.6 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
16,261
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.