I-89 NH 10 SB over HARDY HILL ROAD

2.5 MI FROM ENFIELD T.L. · County 009, New Hampshire · Built 1966 · 2 Lanes · 16,677 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014401550011700
Year Built
1966
Reconstructed
2017
Length
14.5 m (47.6 ft)
Max Span
12.6 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
16,677
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000