US 4 NH 10 over MASCOMA RIVER

6.4 MI FROM HANOVER TL · County 009, New Hampshire · Built 1954 · 2 Lanes · 8,395 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
014401200011500
Year Built
1954
Reconstructed
2019
Length
20.1 m (65.9 ft)
Max Span
18.9 m
Width
17.5 m (57.4 ft)
Lanes
2
Daily Traffic
8,395
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.