SPRING STREET over GREAT BROOK

0.3 MI FR NH ROUTE 120 · County 009, New Hampshire · Built 1953 · 2 Lanes · 591 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014401210010800
Year Built
1953
Reconstructed
2004
Length
12.9 m (42.3 ft)
Max Span
11.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
591
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.