NH120 over I-89

.7MI FROM JCT RTE 4 · County 009, New Hampshire · Built 1966 · 7 Lanes · 11,531 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014401280012600
Year Built
1966
Reconstructed
1999
Length
63.9 m (209.6 ft)
Max Span
18.7 m
Width
34.3 m (112.5 ft)
Lanes
7
Daily Traffic
11,531
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.