CC215NRmp to US95N over N Buffalo Drive

Centennial Bowl · County 003, Nevada · Built 2022 · 2 Lanes · 3,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H3030
Year Built
2022
Length
59.4 m (194.9 ft)
Max Span
59.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
3,700
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.