CC215S over Oso Blanca Road

Centennial Bowl · County 003, Nevada · Built 2023 · 3 Lanes · 5,650 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H3031
Year Built
2023
Length
67.1 m (220.1 ft)
Max Span
67.1 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
5,650
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.