Rmp US95 SkyPointe over US95 R1 R2 R3

Centennial Bowl · County 003, Nevada · Built 2023 · 3 Lanes · 35,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H3029
Year Built
2023
Length
156.9 m (514.8 ft)
Max Span
42.6 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
35,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.