US95S Ramp to 215N over CC215 US95

CENTENNIAL BOWL · County 003, Nevada · Built 2020 · 1 Lanes · 46,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I3026
Year Built
2020
Length
504.4 m (1654.9 ft)
Max Span
68 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
46,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.