CC215S Ramp to OB over US95 R1 R3

Centennial Bowl · County 003, Nevada · Built 2023 · 1 Lanes · 350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H3027
Year Built
2023
Length
149.4 m (490.2 ft)
Max Span
39.6 m
Width
10.4 m (34.1 ft)
Lanes
1
Daily Traffic
350
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.