US95N Ramp to 215S over CC215 US95 OSO BLANCO

CENTENNIAL BOWL · County 003, Nevada · Built 2020 · 2 Lanes · 15,765 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I3020
Year Built
2020
Length
803.1 m (2634.8 ft)
Max Span
73.2 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
15,765
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.