CC215N over US95

Centennial Bowl · County 003, Nevada · Built 2022 · 3 Lanes · 31,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H3028
Year Built
2022
Length
152.2 m (499.3 ft)
Max Span
40.2 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
31,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.