EN Ramp CC215 over Oso Blanco

US95 @ CC215 NW · County 003, Nevada · Built 2022 · 1 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H3024
Year Built
2022
Length
100.6 m (330.1 ft)
Max Span
54.9 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.