Foothill Road over Mission Res Inlet 043
6 M SE St ignatius · County 047, Montana · Built 2023 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.289611, -114.033028
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 3 years old.
Nearby Bridges
MISSION CREEK ROAD over SOUTH MISSION RESERVIOR
Built 2019
FOOTHILL RD over MISSION CREEK 044
Built 1988
HILLSIDE ROAD over MISSION CREEK
Built 2021
IRR BIA RTE 1012 over DRY CREEK CANAL
Built 1975
IRR BIA RTE 12 over MISSION DAM CREEK
Built 2010
MISSION DAM ROAD over MISSION CREEK
Built 2021
S MAIN AVE over MISSION CREEK 052
Built 1929
ALLISON RD over PABLO FEEDER CANAL 046
Built 1960
US 93 over MISSION CREEK
Built 2006
US 93 over SABINE CREEK-WILDLIFE
Built 2006
Bridge Details
- Structure #
- 000000202303281
- Year Built
- 2023
- Length
- 12.2 m (40 ft)
- Max Span
- 11.5 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.