US 93 over SABINE CREEK-WILDLIFE
1M S ST IGNATIUS · County 047, Montana · Built 2006 · 2 Lanes · 7,746 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
47.312861, -114.115722
This bridge is in worse condition than 19% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 20 years old.
Nearby Bridges
US 93 over MISSION CREEK
Built 2006
S MAIN AVE over MISSION CREEK 052
Built 1929
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
MISSION DAM ROAD over MISSION CREEK
Built 2021
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
OLD FREIGHT ROAD over MISSION CREEK 105
Built 2012
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over GRADE SEPARATION
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
Bridge Details
- Structure #
- P00005031+07421
- Year Built
- 2006
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Lanes
- 2
- Daily Traffic
- 7,746
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.