US 93 over MISSION CREEK
ST IGNATIUS · County 047, Montana · Built 2006 · 3 Lanes · 7,746 vehicles/day
Overall
Deck
5
Fair
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
47.319583, -114.105722
This bridge is in worse condition than 75% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 20 years old.
Nearby Bridges
S MAIN AVE over MISSION CREEK 052
Built 1929
US 93 over SABINE CREEK-WILDLIFE
Built 2006
MISSION DAM ROAD over MISSION CREEK
Built 2021
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
OLD FREIGHT ROAD over MISSION CREEK 105
Built 2012
HILLSIDE ROAD over MISSION CREEK
Built 2021
Bridge Details
- Structure #
- P00005032+04001
- Year Built
- 2006
- Length
- 40.5 m (132.9 ft)
- Max Span
- 40.5 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 3
- Daily Traffic
- 7,746
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.