HILLSIDE ROAD over MISSION CREEK
1.5 MILES E. ST. IGNATIUS · County 047, Montana · Built 2021 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
47.306667, -114.054444
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 5 years old.
Nearby Bridges
FOOTHILL RD over MISSION CREEK 044
Built 1988
IRR BIA RTE 12 over MISSION DAM CREEK
Built 2010
MISSION DAM ROAD over MISSION CREEK
Built 2021
Foothill Road over Mission Res Inlet 043
Built 2023
MISSION CREEK ROAD over SOUTH MISSION RESERVIOR
Built 2019
S MAIN AVE over MISSION CREEK 052
Built 1929
US 93 over MISSION CREEK
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over SABINE CREEK-WILDLIFE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
Bridge Details
- Structure #
- 000000202108035
- Year Built
- 2021
- Length
- 12.2 m (40 ft)
- Max Span
- 11.6 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.