IRR BIA RTE 12 over MISSION DAM CREEK
3.2KM E OF ST IGNATIUS MT · County 047, Montana · Built 2010 · 2 Lanes · 30 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.312144, -114.025194
This bridge is in worse condition than 19% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 16 years old.
Nearby Bridges
FOOTHILL RD over MISSION CREEK 044
Built 1988
MISSION CREEK ROAD over SOUTH MISSION RESERVIOR
Built 2019
HILLSIDE ROAD over MISSION CREEK
Built 2021
Foothill Road over Mission Res Inlet 043
Built 2023
ALLISON RD over PABLO FEEDER CANAL 046
Built 1960
IRR BIA RTE 1012 over DRY CREEK CANAL
Built 1975
MISSION DAM ROAD over MISSION CREEK
Built 2021
S MAIN AVE over MISSION CREEK 052
Built 1929
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over MISSION CREEK
Built 2006
Bridge Details
- Structure #
- 00000000000P852
- Year Built
- 2010
- Length
- 17.3 m (56.8 ft)
- Max Span
- 16.3 m
- Width
- 5.6 m (18.4 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.