ALLISON RD over PABLO FEEDER CANAL 046
3M NE ST IGNATIUS · County 047, Montana · Built 1960 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
47.343389, -114.011892
This bridge is in worse condition than 89.7% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 66 years old.
Nearby Bridges
IRR BIA RTE 12 over MISSION DAM CREEK
Built 2010
FOOTHILL RD over MISSION CREEK 044
Built 1988
MISSION CREEK ROAD over SOUTH MISSION RESERVIOR
Built 2019
HILLSIDE ROAD over MISSION CREEK
Built 2021
Foothill Road over Mission Res Inlet 043
Built 2023
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
MISSION DAM ROAD over MISSION CREEK
Built 2021
S MAIN AVE over MISSION CREEK 052
Built 1929
Bridge Details
- Structure #
- L24358003+02001
- Year Built
- 1960
- Reconstructed
- 1999
- Length
- 8.4 m (27.6 ft)
- Max Span
- 7.7 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.