IRR BIA RTE 1012 over DRY CREEK CANAL
9 KM S.E. OF ST. IGNATIUS · County 047, Montana · Built 1975 · 1 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
47.275322, -114.006989
This bridge is in worse condition than 89.7% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 51 years old.
Nearby Bridges
Foothill Road over Mission Res Inlet 043
Built 2023
MISSION CREEK ROAD over SOUTH MISSION RESERVIOR
Built 2019
FOOTHILL RD over MISSION CREEK 044
Built 1988
IRR BIA RTE 12 over MISSION DAM CREEK
Built 2010
HILLSIDE ROAD over MISSION CREEK
Built 2021
MISSION DAM ROAD over MISSION CREEK
Built 2021
ALLISON RD over PABLO FEEDER CANAL 046
Built 1960
S MAIN AVE over MISSION CREEK 052
Built 1929
US 93 over MISSION CREEK
Built 2006
US 93 over SABINE CREEK-WILDLIFE
Built 2006
Bridge Details
- Structure #
- 00000000000P816
- Year Built
- 1975
- Reconstructed
- 1996
- Length
- 6.7 m (22 ft)
- Max Span
- 6 m
- Width
- 5.8 m (19 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $66,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.