HWY OLYMPIA AVE over RR MBTA/BMRR
1.1 KM W STONEHAM · County 017, Massachusetts · Built 1963 · 2 Lanes · 9,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.498739, -71.134961
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 63 years old.
Nearby Bridges
I 95 /ST128 over RR MBTA/BMRR
Built 1950
HWY MISHAWUM RD over RR MBTA/BMRR
Built 1977
HWY MISHAWUM RD over I 95 /ST128
Built 1961
HWY WASHNGTON ST over I 95 /ST128
Built 1961
HWY SALEM ST over RR MBTA/BMRR
Built 2021
I 95 NB/ST128 NB over HWY FOREST PARK RD
Built 1950
I 95 SB/ST128 SB over HWY FOREST PARK RD
Built 1950
I 93 over I 95 /ST128
Built 1957
I 93 over HWY WEST ST
Built 1959
HWY SALEM ST over I 93
Built 1957
Bridge Details
- Structure #
- W430442CLDOT634
- Year Built
- 1963
- Length
- 48.2 m (158.1 ft)
- Max Span
- 14 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 9,500
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,454,000
- Total Project Cost
- $6,682,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.