I 93 over I 95 /ST128
RT 93 AT RT 128 · County 017, Massachusetts · Built 1957 · 8 Lanes · 200,824 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
42.502222, -71.118889
This bridge is in worse condition than 89.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
HWY WASHNGTON ST over I 95 /ST128
Built 1961
I 93 over HWY WEST ST
Built 1959
HWY SALEM ST over I 93
Built 1957
I 95 /ST128 over ST 28 MAIN ST
Built 1950
HWY OLYMPIA AVE over RR MBTA/BMRR
Built 1963
I 95 /ST128 over RR MBTA/BMRR
Built 1950
HWY MISHAWUM RD over RR MBTA/BMRR
Built 1977
HWY HOPKINS ST over I 95 /ST128
Built 1959
HWY SALEM ST over RR MBTA/BMRR
Built 2021
HWY MISHAWUM RD over I 95 /ST128
Built 1961
Bridge Details
- Structure #
- R030112HKDOTNBI
- Year Built
- 1957
- Reconstructed
- 1987
- Length
- 75.6 m (248 ft)
- Max Span
- 23.5 m
- Width
- 52.5 m (172.2 ft)
- Lanes
- 8
- Daily Traffic
- 200,824
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $35,658,000
- Total Project Cost
- $53,488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.