HWY WASHNGTON ST over I 95 /ST128

0.5 MI W OF I-93 · County 017, Massachusetts · Built 1961 · 2 Lanes · 45,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W430282LBDOTNBI
Year Built
1961
Length
48.8 m (160.1 ft)
Max Span
24.1 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
45,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,154,000
Total Project Cost
$7,732,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.