I 95 NB/ST128 NB over HWY FOREST PARK RD
1 MI NE RT 128 & RT 3A · County 017, Massachusetts · Built 1950 · 4 Lanes · 83,334 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.500431, -71.148542
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 76 years old.
Nearby Bridges
I 95 SB/ST128 SB over HWY FOREST PARK RD
Built 1950
HWY MISHAWUM RD over I 95 /ST128
Built 1961
I 95 NB/ST128 NB over ST 38 WB/MAIN ST
Built 1949
I 95 SB/ST128 SB over ST 38 WB/MAIN ST
Built 1949
I 95 SB/ST128 SB over ST 38 SB/MAIN ST
Built 1949
I 95 NB/ST128 NB over ST 38 SB/MAIN ST
Built 1949
HWY MISHAWUM RD over RR MBTA/BMRR
Built 1977
I 95 /ST128 over RR MBTA/BMRR
Built 1950
HWY OLYMPIA AVE over RR MBTA/BMRR
Built 1963
HWY SALEM ST over RR MBTA/BMRR
Built 2021
Bridge Details
- Structure #
- W430242FADOTNBI
- Year Built
- 1950
- Reconstructed
- 1961
- Length
- 41.1 m (134.8 ft)
- Max Span
- 15.8 m
- Width
- 20.9 m (68.6 ft)
- Lanes
- 4
- Daily Traffic
- 83,334
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,699,000
- Total Project Cost
- $8,549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.