I 95 NB/ST128 NB over ST 38 WB/MAIN ST

RT 128 AT RT 38 · County 017, Massachusetts · Built 1949 · 4 Lanes · 80,004 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W430312F6DOTNBI
Year Built
1949
Reconstructed
1961
Length
21.6 m (70.9 ft)
Max Span
19.5 m
Width
20.9 m (68.6 ft)
Lanes
4
Daily Traffic
80,004
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,303,000
Total Project Cost
$1,955,000