I 95 /ST128 over RR MBTA/BMRR
1.6 KM W OF I-93 & I-95 · County 017, Massachusetts · Built 1950 · 8 Lanes · 192,672 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
42.502114, -71.136528
This bridge is in worse condition than 89.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 76 years old.
Nearby Bridges
HWY MISHAWUM RD over RR MBTA/BMRR
Built 1977
HWY OLYMPIA AVE over RR MBTA/BMRR
Built 1963
HWY MISHAWUM RD over I 95 /ST128
Built 1961
HWY WASHNGTON ST over I 95 /ST128
Built 1961
I 95 NB/ST128 NB over HWY FOREST PARK RD
Built 1950
I 95 SB/ST128 SB over HWY FOREST PARK RD
Built 1950
I 93 over HWY WEST ST
Built 1959
I 93 over I 95 /ST128
Built 1957
HWY SALEM ST over RR MBTA/BMRR
Built 2021
I 95 NB/ST128 NB over ST 38 WB/MAIN ST
Built 1949
Bridge Details
- Structure #
- W430262FCDOTNBI
- Year Built
- 1950
- Reconstructed
- 1961
- Length
- 37.8 m (124 ft)
- Max Span
- 13.4 m
- Width
- 44.9 m (147.3 ft)
- Lanes
- 8
- Daily Traffic
- 192,672
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,077,000
- Total Project Cost
- $16,616,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.